ENZO by Careston Properties: Prices, Availability, Plans
530 West 59th Avenue, Vancouver, BC, Canada
- Property ID: 15706
- Post Updated: 2024-04-08 13:12:24
- Status: Active
- Type: Townhouse
- Number of Units: 20
- Number of Stories: 3
- Selling Status: Registration
- Sales Start: To Be Determined
- Construction Status: Pre-construction
- Construction Start: To Be Determined
- Estimated Completion: To Be Determined
- Architect(s): Yamamoto Architecture Inc.
Description
ENZO is a new townhouse community byCareston Propertiescurrently in preconstruction at 530 West 59th Avenue, Vancouver. The community is scheduled for completion in 2026. ENZO has a total of 20 units.
Embark on a west side story that unfolds the art of harmonious living, revealing unseen townhouse features. Experience the graceful interplay of Japandi Design and Danish Hygge in the heart of the city’s celebrated core.
Enzo’s Distinctive Offerings:
– Family Friendly 3-Bedroom Plus Den Units in Non-stack Townhouse
– Uniquely Unseen Appliance and Amenity Designs
– Efficient Floor Plans with Optimal Living Space and Ample Storage
– Extra-wide Courtyard for Family-Oriented Outdoor Livings
– Secure and Trendsetting Smart Townhomes
– Cradled Within Three Master-planned Communities for Visionary Foresight
Features and finishes
Enzo is located in South Cambie, across from large developments such as Cambie Gardens and Langara Gardens. It will also be steps away from the future 57th Cambie Street Skytrain Station. Amenitites in the area include Langara Golf Course, parks, educational institutions, and the soon-to-be revamped Marpole-Oakridge Community Centre. The homes have several features which includes a mudroom with built in storage, 1Valet Smart Entry system, built-in safe (BlumSafe), and Dekton countertops. All homes come with one parking stall (Level 2 EV) and three bike lockers. The deposit structure is as follows: first deposit of $10,000 upon contract writing, second deposit of 5% 14 days from contract date, third deposit of 5% 90 days from contract date, and a final deposit of 5% upon receipt of building permit and financing amendment to the disclosure statement. Completion is targeted for Summer 2026., Kitchen Floor: Engineered Hardwood, Kitchen Counter: Others, Entry Floor: Engineered Hardwood, Living Area Floor: Engineered Hardwood, Bedroom Floor: Engineered Hardwood, Main Bathroom Floor: Tile, Main Bathroom Counter: Others, Ensuite Bathroom Floor: Tile, Ensuite Bathroom Counter: Others, Cabinets: Laminate, Appliance Finish: Integrated, Fridge: Bottom Freezer, Stove: Gas, Brands: Fisher & Paykel, Samsung, Kohler, Heating Source: Vrf, AC: Vrf